California calcium removal

The calcium in this coated VCP 12″ sewer pipe was more than half the diameter of the inside of the pipe and had formed a “pipe in a pipe”. Pacific Sewer Maintenance broke that internal calcium structure into smaller manageable pieces for easy removal with a jetting truck. 600 feet of pipe back to 100 % capacity.

Request online demonstration

Time UTC+1:

Request online demonstration

Thank you for your online demonstration request.

Your preferred date and time will soon be reviewed and login to the online meeting shared. We are looking forward to meeting you.

Best regards,
Sewer Robotics
info@sewerrobotics.com
+3174 289475
+1 503 504 8474