Removing pipe tuberculation (scaling)

Scaling and tuberculation reduced the flow in cast iron pipelines.

The pipe flow was restored with a water jet applied from a robot with camera and rotary nozzle with 500bar (7,250psi) water pressure.

Request online demonstration

Time UTC+1:

Request online demonstration

Thank you for your online demonstration request.

Your preferred date and time will soon be reviewed and login to the online meeting shared. We are looking forward to meeting you.

Best regards,
Sewer Robotics
info@sewerrobotics.com
+3174 289475
+1 503 504 8474